TENDERS

Tenders are published regularly in the local newspapers by Qatar Petroleum for supplying materials and equipment and works and services for various departments. Reasonable prices and good quality are the basis for selecting the best bidders.

Qatar Petroleum (QP) invites all prospective Vendors (Suppliers and Contractors) interested to participate in QP Tenders or to be eligible to receive Request for Quotations to register and obtain a QP SAP Vendor Code, a mandatory requirement for the issue of Request for Quotation or Tender Documents by QP.

For more information on e-Registration, please visit Vendor Registration page.  

To receive an email notification when new tenders are issued by Qatar Petroleum, please subscribe to Tender Alert by entering your email address in the box on the right and click submit.

 

IMPORTANT NOTICE: INTRODUCTION OF TENDER ISSUE PERIOD OF TWO WEEKS

Effective 11th November, 2012, Tenders published in newspapers and on the QP website are available for collection for a period of two weeks only (the Tender Issue Period), unless indicated otherwise.

Tenderers can collect the Tender document during the specified Tender Issue Period only. Requests for issuance of Tenders after the specified Tender Issue Period will not be entertained.

QP reserves its right to specify a Tender Issue Period different from the above and to revise the same as and when required, based on its operational requirements.

Future Tenders (Engineering - Onshore Projects)

EPIC FOR PHASE 2 LANDSCAPING IN RAS LAFFAN

Tender Description:
As part of RLC's green cover initiative, Phase-1 of the landscaping covering Ras Laffan Avenue, Aysha Street and part of Tariq Street was completed in 2009. A FEED to provide Scope of Works for EPIC packages for Phase 2 and 3 of an integrated landscaping water network and soft & hard landscaping has been completed. Based on the above, it is proposed to take up the EPIC for the phase 2 of the Landscaping Project in RLC under this tender package. The EPIC contractor shall verify existing design information and undertake the residual design and detail engineering activities for carrying out the Soft / Hard Landscaping of all roads and buffer zones covered under phase 2, including the piping network in RLC as per the drawings/documents to be issued with the tender. The works are broadly divided into four areas, namely: ",,1.Treated Industrial Water (TIW) collection, storage and pumping system ",,2.Treated Sewage Effluent (TSE) system ",,3.Landscaping Mains and Distribution Network ",,4.Hard and Soft Landscaping. The major work items include ",,4 No Tanks for TIW Storage (2 No. @ 5640m3 & 2 No. @ 6330m3) and 2 No. associated Pumping Stations, Buildings, etc. ",,Approximately 150 km of HDPE Pipework for TIW, TSE and Landscaping Mains and Distribution Pipework. ",,Soft and Hard landscaping along approximately 100 km of roads and buffer zones, including control systems.
Location:
Contracts Dept. - Engineering Division, Qatar Petroleum, Fareej Bin Dirham,Al-Handasa Complex, Mezzanine Fl, Room A-M03,B-Ring Rd, Doha
Planned Tender Issue:
4th Quarter 2011
Planned Contract Award:
3rd Quarter 2012
Note:

a) The above details are for information only and are subject to change without advice or notification from Qatar Petroleum.

b) Qatar Petroleum will not under any circumstances accept any liability for the accuracy of the details provided above nor for any event arising from the use or interpretation of the information.

c) All prospective bidders wishing to participate in Qatar Petroleum tenders issued by the Contracts Department shall be a QP registered vendor with a SAP Vendor ID. To obtain a SAP ID, the potential bidder must submit a duly completed Vendor Master File Update (VMFU) Form together with supporting documents as detailed in Vendor Master Update Guidelines posted in QP Website.

d) All bidders shall ensure that the business/company name, contact persons and other details in all relevant documents to reflect the details as stated in the commercial registration documents.

e) Bidders/Contractors, who are registered with QP and possess a QP SAP Vendor ID, shall with immediate effect ensure that any change to the vendor details is updated with QP by submitting a duly completed Vendor Master File Update (VMFU) Form to ensure smooth processing of Tender, Contract and Payment related matters without any delay.